PRIMAVERA P6
Primavera P6 Professional course is a powerful easy-to-prepare for planning, managing and
executing projects. Primavera P6 Course is the right planning tool for construction, oil and gas project.
Online/Offline
class available
All
Skill Level
32 Hrs / 4 Days
Duration
English
Language
COURSE OVERVIEW
Primavera P6 course gives today’s project managers and scheduler’s to plan for project control. Primavera P6
course recognized as high-performance project management software, is designed to handle large-scale,
multifaceted projects. Primavera P6 project management software course can be used to organize projects of up
to 100,000 activities and it provides for unlimited resources and an unlimited number of target plans. Primavera
P6 training course develops to organize, filter, sort activities, projects, and resources in a fast track schedule in 2
days primavera p6 training schedule.
WHAT YOU WILL LEARN?
Primavera
P6 training course develops to organize, filter, sort activities, projects, and resources in a fast track schedule in 2
days primavera p6 training schedule.
WHO SHOULD TAKE THIS COURSE?
Civil/Mechanical Engineers, Site Engineers, Project Engineers, Construction Managers and Project
Managers, Project Directors
COURSE OUTLINE
Introduction to Primavera P6
• Understanding Primavera P6 Architecture
• Getting Familiar with the Primavera P6
Interface
• Opening A Project & Understanding EPS
• Creating a New Project
• An Overview of Work Breakdown structure
• Adding WBS
• Importing PLF Layout Files
• Adding Activities
• The 4 Types of Activity Relationships
• Adding Relationships Links
• Introduction to Activity Layouts
• Setting Up A Basic Activity Layout
• Importing XER Files
• Exporting Projects to An XER File
Resource Management
• Introduction to Resource Management in
Primavera P6
• Resource Concepts
• Essential Resource Configuration Fields in
Primavera P6
• Adding Labor Resources
• Adding Non-Labor Resources
• Adding Material Resources
• Understanding Resource Codes
• Adding and Administering Resource Codes
• Resource-Loading A Schedule
• Assigning Resources at the WBS Level using
WBS Summary
• High-Level Resource Assignments
• Finding Resource Over-allocations
• Resolving Resource Over-allocations
Cost Management
• Understanding Activity Codes in Primavera P6
• Creating Activity Codes
• Assigning Activity Codes
• Essentials of Grouping & Filtering with Activity
Codes
• Understanding the 3 Types of Activity Codes
• Build a Multi-Project Report Using Activity
Codes
• Tallying Costs using Activity Codes
Views and Customization
• User defined column as per request
• Create self-customized formulae
• Build multi scenario layout
• Modify Gantt Chart views
Scheduling
• What is CPM Scheduling
• CPM Scheduling Example
• Scheduling In Primavera P6
• Working with the P6 Scheduler
• Total Float and Project Deadlines
• Must Finish By Deadlines
• Understanding Calendars
• Creating Calendars
• Assigning Calendars and using Fill-Down
• Understanding Constraints
• Applying Activity Constraints
• Organizing Activities and Renumbering Activity
IDs
Project Baselines
• Primavera P6 Baseline Concepts
• Create a Baseline in Primavera P6
• Baseline Fields and Data in P6
• Displaying Baseline Data
• Updating a project Baseline in P6
• Copying a Baseline in P6
• Converting a Baseline Back to a Project
• Evaluating your Project against a Baseline
• Build a Baseline Comparison Layout
• Building a Baseline Date Variance Layout
Progress Updating
• Essential Concepts to Progressing a Schedule
• The Primavera P6 Data Date
• Actual Fields in Primavera P6
• Build A Great Progressing Layout
• The Pitfalls of Percent Complete Types
• Percent Complete Fields and Settings
• A Walkthrough of Each Percent Complete Type
• Which % Complete Type To Use On Your Project
• The Helpful Progress Spotlight Tool
• Progressing A Milestone
• Simple Activity Progressing
• Checklist: Simple Activity Progressing
• Progressing Resource & Cost-loaded Activities
• Checklist: Resource & Cost-loaded Activities
• Progressing Level of Effort and WBS Summaries
• Removing Progress and Fixing Mistakes
• Moving the Data Date
• Final Thoughts on Progressing
Project Reporting
• Generating Graphical and Tabular reports
• Creation and customization of New Report as
well as in-built reports.
• Working on Look-Ahead and Look-Behind report
*The suggested course duration is a guideline.
Course topics and duration may be modified by the instructor based upon the knowledge
and skill level of the course participants.